Description: From l-adm-8.energo.lv:

Riga HPP is the most recent of the three hydropower plants on the river Daugava. The first stage of the Daugava hydropower plants cascade was built on the island Dole, 35 km from the Daugava mouth. The construction of Riga HPP was started in 1966, the first hydroaggregate was put into operation in 1974, and in 1976 the hydropower plant was operated at full capacity. Clay and dolomite form the foundation of the hydrotechnical constructions.

Installed capacity, MW: 402
Number of hydro aggregates: 6
Maximum head, m: 18
Dam length, m: 15400
Multiple annual average flow , m3/s: 640
Water reservoir capacity , million m3: 324,6
More Info: l-adm-8.energo.lv
Location: Salaspils, Latvia (LV)
@ 56.85223900, 24.27229200
Views: 184
Rating: Rate as 1 Rate as 2 Rate as 3 Rate as 4 Rate as 5 Rate as 6 Rate as 7 Rate as 8 Rate as 9 Rate as 10 7.0 (6 votes)

Categories

Download

Tell
Share
Update Imagery

Nearby Maps (50 km): (29)
  1. Rail Turntable (7.6km)
  2. Riga TV Tower (11.4km)
  3. Daugavas Stadions (13.3km)
  4. Centrāltirgus (Central Market) (14km)
  5. Stadions Latvijas Universitates (14.4km)
  6. Sv. Pētera Baznica (St. Peter's Cathedral) (14.5km)
  7. Melngalvju Nams (Blackhead's House) (14.6km)
  8. Brīvības Piemineklis (Freedom Monument) (14.7km)
  9. Pareizticīgo Katedrāle (Orthodox Cathedral) (14.8km)
  10. United States Embassy in Latvia (14.9km)
19 more...



Post a Comment: (Policies)

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Name: Anonymous
Comment:
Anti-Spam Code: Please enter the code below:
Please enable images and enter code to post
Pre-Caching Vote image