Under construction in this picture but was was launched on 2 November, 2004.
Capable of carrying 145,000 cubic metres of LNG.
Intended to ship liquefied natural gas from Statoil’s Snøhvit development in the Barents Sea.
No Longer There
Links: www.statoil.com
By: kjfitz