Beinn Ghlas Wind Farm

Beinn Ghlas Wind Farm


Connel, United Kingdom (GB)
Beinn Ghlas Wind Farm was completed in May 1999. The official opening took place in June 1999 where Kevin Dunion, Director of Friends of the Earth, Scotland was the Guest of Honour. The last turbine was switched on by 9 year old Jessica Dalgleish.

It was named after Jessica, following a letter she wrote to npower renewables saying "I can see the wind farm from my house. I think they look like angels. Could you call one of your angels after me, Jessica?"

Advertisement

The wind farm consists of 14 wind turbines each of 600 kilowatts (kW) maximum output, manufactured by Bonus Energy A/S of Denmark and has a combined maximum power of 8.4 megawatts (MW).
Beinn Ghlas Wind Farm was completed in May 1999. The official opening took place in June 1999 where Kevin Dunion, Director of Friends of the Earth, Scotland was the Guest of Honour. The last turbine was switched on by 9 year old Jessica Dalgleish.

It was named after Jessica, following a letter she wrote to npower renewables saying "I can see the wind farm from my house. I think they look like angels. Could you call one of your angels after me, Jessica?"

The wind farm consists of 14 wind turbines each of 600 kilowatts (kW) maximum output, manufactured by Bonus Energy A/S of Denmark and has a combined maximum power of 8.4 megawatts (MW).
View in Google Earth Power - Wind, Safari Submissions
Links: www.rwe.com
By: jbottero

Advertisement

Around the World Mailing List

Comments

Policies
Please enable images and enter code to post
Reload

Advertisement