Capanda Dam

The Capanda Dam is a hydroelectric dam on the Kwanza River in Malanje Province, Angola. The facility generates power by utilizing four turbines and 130 MW each, totalling the installed capacity to 520 MW. The dam was constructed by Gamek, a government body, for a total cost of US$4 billion. An additional cost of more than US$400 million was spent in repairing the damage caused during UNITA's occupation of the area at the time of the Angolan Civil War in 1992 and 1999.
101 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload
Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload