Deriner Dam

Deriner Dam (Turkish: Deriner Barajı) is a concrete double-curved arch dam under construction on the Çoruh River 5 km (3.1 mi) east of Artvin in Artvin Province, Turkey. The main purpose of the dam is hydroelectric power production and additionally flood control. Construction on the dam began in 1998, the reservoir began to fill in February 2012 and the power station is expected to be operational by 12 December 2012. It will have a 670 MW power house and is the tallest dam in Turkey. The dam is being implemented by Turkey's State Hydraulic Works and constructed by a consortium of Turkish, Russian and Swiss companies.
234 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Collections

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload
Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload