Dobra Bridge

Dobra Bridge


Karlovac, Croatia (HR)
The Dobra Bridge is located between Karlovac and Novigrad interchanges of the A1 motorway in Croatia, spanning Dobra River. It is 546 metres (1,791 ft) long, and it comprises four traffic lanes and two emergency lanes.

Construction work on the Dobra Bridge started in 1999 and was completed in 2001. Cost of the construction work was 57 million Croatian kuna (7.7 million euro). During the construction there was one major incident: On July 1, 2000, three girders plummeted from the main span piers into the river below. The incident did not cause any injury and damage was reported to be marginal.
The Dobra Bridge is located between Karlovac and Novigrad interchanges of the A1 motorway in Croatia, spanning Dobra River. It is 546 metres (1,791 ft) long, and it comprises four traffic lanes and two emergency lanes.

Construction work on the Dobra Bridge started in 1999 and was completed in 2001. Cost of the construction work was 57 million Croatian kuna (7.7 million euro). During the construction there was one major incident: On July 1, 2000, three girders plummeted from the main span piers into the river below. The incident did not cause any injury and damage was reported to be marginal.
View in Google Earth Bridges - Automobile
Links: en.wikipedia.org
By: kkeps

Advertisement

Advertisement

Around the World Mailing List

Comments

Policies
Please enable images and enter code to post
Reload

Advertisement