Fuller Warren Bridge

Fuller Warren Bridge


Jacksonville, Florida (FL), US
The Fuller Warren Bridge is a prestressed concrete girder bridge that carries I-95 across the St. Johns River in Jacksonville, Florida. The current bridge was completed in October 2002, replacing the original bascule bridge span completed in 1954. The current bridge was designed by HNTB Corporation in 1990. The entire bridge is over 7,500 ft (2,300 m). long, with a main span of 250 feet (76 m), and a vertical clearance of 75 ft (23 m). The bridge now carries eight lanes across the span.
The Fuller Warren Bridge is a prestressed concrete girder bridge that carries I-95 across the St. Johns River in Jacksonville, Florida. The current bridge was completed in October 2002, replacing the original bascule bridge span completed in 1954. The current bridge was designed by HNTB Corporation in 1990. The entire bridge is over 7,500 ft (2,300 m). long, with a main span of 250 feet (76 m), and a vertical clearance of 75 ft (23 m). The bridge now carries eight lanes across the span.
View in Google Earth Bridges - Misc, Safari Submissions
Links: upload.wikimedia.org
By: Mike1989

Advertisement

Advertisement

Around the World Mailing List

Comments

Policies
Please enable images and enter code to post
Reload

Advertisement