Gran Sasso Tunnel

Gran Sasso Tunnel (StreetView)
There are two tunnels, each with two lanes for each direction, 10,176 meters long, that also host the Laboratori Nazionali del Gran Sasso.

Construction started on November 14, 1968. The eastbound tunnel (to Teramo) opened the December 1, 1984; while the westbound tunnel (to L'Aquila) opened in 1995.
1,086 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload