Gran Sasso Tunnel

There are two tunnels, each with two lanes for each direction, 10,176 meters long, that also host the Laboratori Nazionali del Gran Sasso.

Construction started on November 14, 1968. The eastbound tunnel (to Teramo) opened the December 1, 1984; while the westbound tunnel (to L'Aquila) opened in 1995.
432 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload
Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload