Malibu Marine lake test facility

No Thumbnail
Malibu Marine lake test facility (Birds Eye)
The first stage of lake test will include a dry-dock test, all electrical items will be tested to ensure they are operating correctly. Once dry-dock testing is completed the boat will be moved to the water, once on the water there is a 50 point quality assurance check list that will be completed.

Every Malibu built is lake tested to ensure that the boats complete electronic and mechanical functions are operating and functioning harmoniously. All electronics are run through their paces for precision and function, the speedometer is calibrated with a radar gun, the Malibu Precision Pro Speed Control is activated and run through it’s settings, the Wedge is deployed and raised for proper functionality, the ballast system is filled and drained, electronic and mechanical systems all receive the final Malibu test to ensure every Malibu is completed and ready for shipment to your local Malibu dealer.
643 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload