Begun in 1957 and completed in 1965, the Mont Blanc Tunnel is 11,611 metres (7.215 mi) long, 8.6 metres (28 ft) wide, and 4.35 metres (14.3 ft) high.
Begun in 1957 and completed in 1965, the Mont Blanc Tunnel is 11,611 metres (7.215 mi) long, 8.6 metres (28 ft) wide, and 4.35 metres (14.3 ft) high. Tunnels, Safari Submissions Links: en.wikipedia.org, virtualglobetrotting.com By: WacoKidd110