Oak Ridge Y-12 nuclear fuel processing plant

Oak Ridge Y-12 nuclear fuel processing plant


Oak Ridge, Tennessee (TN), US
Construction on Y-12 began in February 1943 to implement the electromagnetic separation method, with first production in November of the same year (although construction continued through 1945). Tennessee Eastman took over operation of Y-12 in June 1943.

At Y-12, nine main processing buildings and over two hundred support buildings were constructed to house the process. The primary process used calutrons--large arrangements of electro-magnets which separated weapons grade U-235 out of naturally more abundant U-238. Because of the war time shortage of copper, 14,700 tons of silver from the U.S. Treasury were used in the calutron windings and associated electrical conductors. Y-12 employed 22,000 workers in the peak war years period, but the gaseous diffusion process at the K-25 Plant proved to be more effective for uranium enrichment and Y-12 was mothballed at the end of the war. Later the massive Y-12 facility became a nuclear weapons production facility and large scale lithium separation plant, a material critical to the hydrogen bomb.
Construction on Y-12 began in February 1943 to implement the electromagnetic separation method, with first production in November of the same year (although construction continued through 1945). Tennessee Eastman took over operation of Y-12 in June 1943.

At Y-12, nine main processing buildings and over two hundred support buildings were constructed to house the process. The primary process used calutrons--large arrangements of electro-magnets which separated weapons grade U-235 out of naturally more abundant U-238. Because of the war time shortage of copper, 14,700 tons of silver from the U.S. Treasury were used in the calutron windings and associated electrical conductors. Y-12 employed 22,000 workers in the peak war years period, but the gaseous diffusion process at the K-25 Plant proved to be more effective for uranium enrichment and Y-12 was mothballed at the end of the war. Later the massive Y-12 facility became a nuclear weapons production facility and large scale lithium separation plant, a material critical to the hydrogen bomb.
View in Google Earth Power - Nuclear
Links: olive-drab.com
By: kjfitz

Advertisement

Advertisement

Around the World Mailing List

Comments

Policies
Please enable images and enter code to post
Reload

Advertisement