Oliver Dam and Generating Plant, which was completed in 1959 by Georgia Power. The lake was named for James McCoy Oliver, an executive of Georgia Power at the time. Oliver Dam has four turbine units, and the dam itself is 70 feet tall and 2,150 feet (660 m) long.
Dams, Power - Hydro
Links: en.wikipedia.org
By: mlc1us