The Peetz Table Wind Energy Center was constructed in two phases. The first phase of the north-eastern Colorado wind project was completed in 2001 and brought 29.7 megawatts onto the grid. Project owner NextEra Energy Resources then added an additional 400 MW's in 2007, bringing the total capacity to nearly 430 MW. Utilizing 33 NEG Micon turbines for phase 1 and 267 General Electric turbines for phase 2, the Peetz Table Wind Energy Center is one of the United States' largest wind projects. The wind farm has some 28 full-time employees.
762 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload