Weldon Spring toxic cleanup containment cell

Weldon Spring toxic cleanup containment cell (Google Maps)
No Thumbnail
A disposal facility, or cell, is under construction in the area formerly occupied by the chemical plant production buildings. The cell will provide long-term containment and management of the waste materials. It will cover about 45 acres in an area that has been tested to confirm its geological suitability for this use. At its apex the cell will be approximately 75 feet high, and it will contain approximately 1.48 million cubic yards of contaminated material.

The cell will consist of four primary systems: the base liner with leachate collection and removal systems, the contaminated wastes, the clean-fill dike, and the cover systems.
1,711 views
Views by date
7.0 (3 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Categories

Collections

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload