bpTT's Galeota Point Terminal

bpTT's Galeota Point Terminal (Google Maps)
No Thumbnail
From www.amoco.co.tt:

The Beachfield slug catcher (a slug catcher removes condensate from natural gas) and gas distribution facility onshore at Guayaguayare receives gas and condensate from the Mahogany gas field, some 50 miles east of Galeota Point. This gas is distributed via 36-inch pipeline to the Atlantic LNG site at Point Fortin, 47 miles away, while the condensate is removed from the gas and sent to bpTT's Galeota Point Terminal via a six-inch pipeline.
4,371 views
Views by date
10.0 (1 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload