Chelyabinsk-65 / Ozersk Combine 817 / Production Association Mayak

Chelyabinsk-65 / Ozersk Combine 817 / Production Association Mayak (Google Maps)
No Thumbnail
Chelyabinsk-65 (in the past Chelyabinsk-40), currently Ozersk, was established in 1948 to produce plutonium for nuclear weapons. The construction of the Combine 817, currently the Production Association Mayak, began in 1947. The first production reactor (Reactor A) went into operation in June 1948 and the first batch of plutonium was produced at the radiochemical plant (Plant B) on February 26, 1948. This plutonium was fabricated into nuclear device components at the plutonium finishing plant (Plant V). The Chelyabinsk-65 nuclear complex continued to expand during the next four decades and is currently one of the largest and most diverse nuclear facilities in Russia.

The industrial area bordering the southeastern shore of the lake Kyzyltash, where the plutonium production complex is located, is approximately 90 km2.

The production of plutonium in Chelyabinsk-65 took place in five uranium-graphite reactors (A, IR-AI, AV-1, AV-2, and AV-3) commissioned between 1948 and 1955. The uranium-graphite reactors were shut down between 1987 and 1990.
2,902 views
Views by date
5.8 (4 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload