Cliffside glass lift construction halted

Cliffside glass lift construction halted (StreetView)
Authorities in Bali have put a stop to the development of a 182-meter (597-foot) glass elevator planned for a prominent cliff at Kelingking Beach—one of the island’s most iconic and photographed locations. The suspension follows widespread public concern over potential environmental damage. The lift, proposed by a Chinese firm, was intended to improve beach access for tourists.
37 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload