It was built between 1967 and 1972 and projected by A. Tesár, J. Lacko, and I. Slameň. Officially opened on August 26, 1972. It is an asymmetrical cable-stayed bridge with a main span length of 303 metres. Its steel construction hangs on steel ropes, which are mounted on the Petržalka river side at two pillars. The total length of the bridge is 430.8 metres, the width is 21 metres and the weight 7537 tonnes.
Advertisement
The Nový Most has lanes for cars, bikes and walkers.
pictures