Riga Hydro Power Plant (HPP)

Riga Hydro Power Plant (HPP) (Google Maps)
No Thumbnail
From l-adm-8.energo.lv:

Riga HPP is the most recent of the three hydropower plants on the river Daugava. The first stage of the Daugava hydropower plants cascade was built on the island Dole, 35 km from the Daugava mouth. The construction of Riga HPP was started in 1966, the first hydroaggregate was put into operation in 1974, and in 1976 the hydropower plant was operated at full capacity. Clay and dolomite form the foundation of the hydrotechnical constructions.

Installed capacity, MW: 402
Number of hydro aggregates: 6
Maximum head, m: 18
Dam length, m: 15400
Multiple annual average flow , m3/s: 640
Water reservoir capacity , million m3: 324,6
2,055 views
Views by date
7.1 (7 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload