Sasago Tunnel

Sasago Tunnel (Google Maps)
Sasago Tunnel (Bing Maps)
At approximately 8 a.m. on December 2, 2012, nearly 150 concrete ceiling panels inside the Tokyo-bound Sasago Tunnel collapsed, crushing three vehicles, including a van carrying six persons that caught fire. The fallen panels were 20 centimetres (7.9 in) thick and weighed 1.2 tons each. The caved-in point was 2 kilometres (1.2 mi) from the Tokyo-side exit and over a length of 50 to 60 metres (160–200 ft). Smoke could be seen billowing from the Kōshū entrance to the tunnel.

Nine people died and two were injured, making it the deadliest Japanese roadway accident in history. The tunnel was closed for a period of 27 days for repairs and removal of ceiling panels, before the south tube reopened on December 29. The north tube, where the collapse happened, reopened on February 8, 2013.
2,100 views
Views by date
10.0 (1 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload