The 404 megawatt (MW) Peñascal Wind Farm is located in Kenedy County, Texas and was completed in April 2010 by Iberdrola.
The 404 megawatt (MW) Peñascal Wind Farm is located in Kenedy County, Texas and was completed in April 2010 by Iberdrola. Power - Wind, Safari Submissions Links: en.wikipedia.org By: jbottero