The power plant was built between 1958 and 1967. It was owned and operated by Southern California Edison until 1998, when the electric industry was restructured and Southern California Edison sold most of its generating facilities. At that time, AES Southland purchased the Alamitos, Huntington Beach and Redondo Beach generating facilities.
Buildings - Misc
Links: www.aescalifornia.com
By: kjfitz