Usina Hidrelétrica de Jirau

Usina Hidrelétrica de Jirau


Jaci-Paraná, Brazil (BR)
The Jirau Dam is a rock-fill dam with an asphalt-concrete core, currently under construction on the Madeira River in the state of Rondônia, Brazil. The dam's hydroelectric power stations will have 50 turbines each 75 MW resulting total installed capacity of 3,750 MW. The power plant's first unit was commissioned in September 2013, the 16th in November 2014, 24th in February 2015, the 41st in December 2015, and the last in December 2016.[5] Most of the power is designed to be exported to south-eastern Brazil via the Rio Madeira HVDC system.
The Jirau Dam is a rock-fill dam with an asphalt-concrete core, currently under construction on the Madeira River in the state of Rondônia, Brazil. The dam's hydroelectric power stations will have 50 turbines each 75 MW resulting total installed capacity of 3,750 MW. The power plant's first unit was commissioned in September 2013, the 16th in November 2014, 24th in February 2015, the 41st in December 2015, and the last in December 2016.[5] Most of the power is designed to be exported to south-eastern Brazil via the Rio Madeira HVDC system.
View in Google Earth Dams
Links: en.wikipedia.org
By: Matheus_

Advertisement

Advertisement

Around the World Mailing List

Comments

Policies
Please enable images and enter code to post
Reload

Advertisement