Great Orton Repower
Location: Cumbria
Operator: Cumbria Wind Farms Ltd
Configuration: 6 X 660-kW V47
Operation: 2000
WTG supplier: Vestas
EPC: Wind Prospect
Quick facts: The original plant had 10 CWT 300 machines from Carter Wind Systems installed in 1993 at the old RAF Great Orton Airfield (aka Wiggonby) closed in 1952.
Power - Wind, Military - Historic - Closed Facility
Links: www.lastrefuge.co.uk
By: kjfitz