Great Orton Repower
Location: Cumbria
Operator: Cumbria Wind Farms Ltd
Configuration: 6 X 660-kW V47
Operation: 2000
WTG supplier: Vestas
EPC: Wind Prospect
Quick facts: The original plant had 10 CWT 300 machines from Carter Wind Systems installed in 1993 at the old RAF Great Orton Airfield (aka Wiggonby) closed in 1952.
Windmill farm (and foot and mouth burial site) on closed RAF Great Orton
No Thumbnail
© Google Maps
By kjfitz @ 2007-04-15 22:27:50