Hammerfest-Melkøya Tunnel Construction

Hammerfest-Melkøya Tunnel Construction (Google Maps)
No Thumbnail
From cws.huginonline.com:

A joint venture between Veidekke ASA and Selmer Skanska AS has signed a letter of intent in connection with Statoil's development of the "Snow White" field. The contract includes construction of a 2.3 km long sub-sea road tunnel from the mainland near Hammerfest to Melkøya, as well as upgrading of the existing road from Hammerfest to the tunnel entrance. The contract value is approximately NOK 200 million excluding VAT.

The construction work will probably start in March/April with an estimated construction period of 16 months.

"We will have 40 - 50 people on the job", says Veidekke's Project Manager, Mr. Oddvar Soma.

" The joint venture's offer is for a complete tunnel including technical installations. The tunnelling work will take place from two sides, both from Melkøya and from Hammerfest."
1,870 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload