Milford Wind Farm

The Milford Wind is a wind farm north of Milford in the territory of Beaver and Millard counties, Utah, United States. It is the Utah's largest wind energy project with total capacity of 306 MW. The project was developed in tho phases by First Wind. The first phase with a capacity of 204 MW has 97 wind turbines, including 58 Clipper Liberty 2.5-MW wind turbines and 39 GE 1.5 MW wind turbines. It went online in November 2009 and supported more than 300 development and construction jobs. First Wind spent about US$30 million with Utah-based businesses developing and building the first phase of the project. Another $50 million was spent statewide on items such as wages and taxes.
270 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload
Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload