Brooklyn-Battery tunnel ventilation shaft

Brooklyn-Battery tunnel ventilation shaft (Google Maps)
Brooklyn-Battery tunnel ventilation shaft (Bing Maps)
Ventilation is provided by 53 fans, operated by 104 motors that release 6,152,000 cubic feet of fresh air into the tunnel. It takes approximately 90 minutes to completely change the air in the tunnel.
3,443 views
Views by date
6.8 (12 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Categories

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Pics: 1
Brooklyn-Battery tunnel ventilation shaft
Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload