Usina Hidrelétrica de Colíder

Usina Hidrelétrica de Colíder (Google Maps)
No Thumbnail
The Colíder Dam is a rock-fill dam with an asphalt-concrete core, built from 2011 to 2019 on the Teles Pires river. It is located about 40 km (25 mi) southeast of Colíder in the state of Mato Grosso, Brazil. The dam's hydroelectric power stations have 3 turbines each 102.3 MW, resulting in a total installed capacity of 306.9 MW. Construction on the run-of-the-river type station was initiated in May 2011, and the last unit started operating in December 2019.

The dam is part of a planned six power plant "Hidrovia Tapajos/Teles Pires" project to create a navigable waterway connecting the interior of Brazil to the Atlantic Ocean. The waterway will consist of five dams on the Teles Pires river (53 megawatts (71,000 hp) Magessi Dam, 430 megawatts (580,000 hp) Sinop Dam, 300 megawatts (400,000 hp) Colíder Dam, 1,820 megawatts (2,440,000 hp) Teles Pires Dam, 746 megawatts (1,000,000 hp) Sao Manoel Dam) and the 230 megawatts (310,000 hp) Foz do Apiacas Dam on the Apiacas river.
56 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Categories

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload