Usina Hidrelétrica Garibaldi

Usina Hidrelétrica Garibaldi (Google Maps)
No Thumbnail
The Garibaldi Hydroelectric Plant is a hydroelectric plant installed on the Canoas River, in the municipality of Abdon Batista in Santa Catarina. It has an installed capacity of 191.9 MW. The plant belongs to Rio Canoas Energia S.A. (CTG Brazil - China Three Gorges).

Its first generating unit went into operation in September 2013, advancing the installation schedule by 15 months.
71 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Categories

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload