Boiling Nuclear Superheater reactor

The Boiling Nuclear Superheater (BONUS) reactor was built in Rincon, Puerto Rico by the Atomic Energy Commission (with assistance from the Puerto Rico Water Resources Authority). It went on-line in April of 1964, and was generating full power in 1965. Technical difficulties and the need for expensive modifications led to its shutdown in 1968 and subsequent decommissioning.
1,256 views
Views by date
7.3 (4 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload
Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links)

Please enable images and enter code to post
Reload