Karahnjukar Dam Construction

Karahnjukar Dam Construction (Google Maps)
No Thumbnail
Site of Dam Construction. Glacier to the southwest will be source of water. Underground tunnels feed penstock and powerhouse 25 km to the east. Current Landsat Image shows no sign of activity. Photos at link below.

This plant was completed in 2009, so obviously the sat image predates that.

The hydro power supports the The Fjardaál aluminium smelter, which was completed June 2007 and reached full operation in April 2008. Construction began in 2004 and the facility contains a smelter, cast house, rod production and deep-water port. The smelter employs 450 people and produces 940 tons of aluminium a day, with capacity of 346,000 metric tons of aluminium per year. Fjardaál means "Aluminium of the Fjords" in Icelandic.
1,471 views
Views by date
7.3 (3 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Collections

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload
KRL picture
KRL
@ 2010-01-21 13:05:15
Updated Imagery for the area - but blury.