Cedar Creek Wind Farm

Cedar Creek Wind Farm (Google Maps)
No Thumbnail
The Cedar Creek Wind Farm is a 551.3MW, 397 wind turbine facility, consists of 2 phases, Cedar Creek I and Cedar Creek II, located 13km (8 miles) east of Grover in north-central Weld County, Colorado, which became fully operational with the completion of Cedar Creek II in 2010. The initial 300.5 megawatt (MW) Cedar Creek I wind power installation was completed on time, within budget and without incident - with the operation commencing on 21 November 2007. Cedar Creek I is an important contributor to Colorado's New Energy Economy, providing enough wind-powered electricity for 81,135 homes.[1] The power produced from the Cedar Creek wind farm is sold to the Public Service Company of Colorado. Cedar Creek II has an additional 150.8MW of generating capacity, and was commissioned in 2010.
1,053 views
Views by date
UnratedRate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload