Concrete Tunnel Lining Pieces

Concrete Tunnel Lining Pieces (Google Maps)
No Thumbnail
Tunnel-boring machines burrowing their way among Seattle’s downtown, Capitol Hill and the University District are nearing the ends of their journeys.

In a few days, the machine digging Sound Transit’s southbound light-rail tunnel from the University of Washington will emerge at the Capitol Hill station.

A second machine, digging a parallel tunnel, will surface about a month later. The connection to downtown Seattle was completed in June 2012.

That’s cause for celebration in Seattle, but it means the end of the line for workers at a Tacoma concrete-casting plant created with $36 million in Sound Transit tunnel contracts.
863 views
Views by date
8.2 (20 votes)
Rate as 1Rate as 2Rate as 3Rate as 4Rate as 5Rate as 6Rate as 7Rate as 8Rate as 9Rate as 10

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload

Around the World Mailing List

Share:

Comments

Policies

Please log in if you don't want to post anonymously (anonymous users cannot post links).

Note: VirtualGlobetrotting is an entertainment website is and is not associated with this post, location or person.

Please enable images and enter code to post
Reload
jbottero picture
@ 2012-07-05 18:00:41
These, of course, are the tunnel shell pieces stacked up...