Unit 1 began commercial operation in May 1987. Unit 2 began commercial operation in May 1989. Each unit is capable of generating 1,215 megawatts (Mw) for a total capacity of 2,430 Mw. The plant is powered by pressurized water reactors (PWR) manufactured by Westinghouse. The turbines and electric generators are manufactured by General Electric.